- Ends in5d
- High bid $2,010
- Bidders 2

Auction description
Overview
2008 Isuzu NPR HD sweeper truck with Schwarz M5000 sweeper equipment. The vehicle is classified in repairable condition. The truck chassis is operational but requires brake system repairs. The sweeper equipment is non-functional and requires extensive repairs including replacement of rusted components, electrical system restoration, and hydraulic system overhaul.
Key Features
Equipped with independent engine for sweeper operation.
Includes water cooling system and hose adapter connections.
Features brush motor system for sweeping operations.
Condition & Markings
This lot is in repairable condition. Parts are missing, and repairs are required.
Brake system is non-operational and requires repairs.
Sweeper equipment shows severe rust damage throughout multiple components.
Rear engine missing muffler with heat damage to engine intake filter housing.
Electrical harness shows extensive deterioration including nicks, cuts, exposed wiring, and sheared cables.
No electrical components are currently functioning.
Hydraulic system contains aged hoses likely to fail during operation.
Sweeper components and attachments do not activate or function.
Brush motor has leak with part on order.
Water cooler tank is broken.
Water tank for hose adapter requires attention.
Exterior body shows opaque paint and minor rust issues.
Equipment was last operational two years ago.
Sweeper has suction system problems.
Vehicle Documentation
The SF-97 will be issued to the registered individual or company and mailed to the registered address after payment is received.
Inspection and Removal
Specifications
- Make
- Isuzu
- Model
- NPR HD
- Model Year
- 2008
- Mileage
- 5,753
- VIN
- JALC4W16397001685
- Sweeper Equipment
- Schwarz M5000
- Inspection and Removal
- Available Monday through Friday, by confirmed appointment only. The site is closed on federal holidays. Contact the property custodian (listed below) to schedule an appointment.
- Property Inspection
- Bidders are strongly encouraged to inspect the property prior to placing a bid to evaluate its condition and suitability. By bidding without an inspection, bidders assume the risk of potential omissions in the description.
- Removal Responsibilities
- The successful bidder is solely responsible for all aspects of removal, including packing, crating, banding, loading, and shipping. The agency will not provide assistance.
- Authorized Third-Party Removal
- The authorized third-party agent must present a Letter of Authorization from the high bidder (see terms and conditions for details), a copy of the purchaser's receipt, and a valid photo ID at the time of removal.
- Year
- 2008


